English ▾

Scharge by SPT · EV charging station solution

Scharge: turnkey EV charging station solution through a single point of contact

AC/DC chargers from 7 kW to 400 kW, management and payment platform, power infrastructure, deployment, operation and maintenance — SPT supplies, the SST Center operates, CD Restop develops station sites.

The Scharge charger range on the brand blue background: SC14 AC charger, AC floor-standing charger, 40 kW DC charger and SC80 · SC160 DC fast-charging cabinet.
7 – 400 kWAC/DC power range
200 – 1 000 VDC output voltage, 400 V and 800 V vehicles
IP54enclosure protection rating across the range
QR · card · VINcharging session start
OTAremote software updates

01 · Solution overview

One brand, one point of contact

Scharge is the EV charging station brand of SPT (Saigon Postel), comprising AC/DC chargers from 7 kW to 400 kW, a management and payment platform, and services for deploying and operating stations over their full life cycle. The Digital Technology and Services Center (SST) is the Scharge operations center — the customer's single point of contact.

SPTSPT · Parent company

Owner of the Scharge brand; issues product, service and warranty policies.

SST · Scharge Operations Center

The SPT Digital Technology and Services Center receives, coordinates and is accountable to the customer throughout the charging station life cycle.

  1. 01Solution consulting, contracts
  2. 02Equipment supply
  3. 03Digital platform, app
  4. 04Deployment, acceptance
  5. 05Hotline, maintenance, warranty
CD RestopScharge ecosystem developer
  • Station site development, site partnerships
  • Investment in and operation of stations under partnership models
  • Connecting transport companies and fleets
Single point of contact

The SST Operations Center is accountable from consulting and supply through to operation and maintenance.

Full product range

AC 7 kW to DC 400 kW on one management and payment platform.

40 kW modular design

Flexible power allocation between two connectors; maintenance module by module.

Fast deployment

Equipment supplied in about 03 weeks from order; infrastructure works run in parallel.

Key specifications

7 – 400 kWAC and DC power range in one ecosystem
200 – 1 000 VDC output voltage, charges 400 V and 800 V platform vehicles
250 – 300 ARated current per connector, DC floor-standing cabinets
IP54Enclosure protection rating, indoor and outdoor installation
−25 ~ 50 °COperating temperature, AC and DC floor-standing lines
4G · EthernetPlatform connectivity, monitoring and OTA updates
Explore the architecture and platform

03 · Product range

Product range and charger selection guide

The core line SC14 · SC80 · SC160 covers most needs, from car parks and buildings to fast-charging stations. The extended line — AC floor-standing, DC 40 kW and DC 200 – 400 kW — is supplied per project when the site, power supply or charging load has specific requirements.

Illustrations of the Scharge identity design; the DC 200 – 400 kW cabinet image is an illustrative sketch.

View specifications for the full range

02 · System architecture

Three layers: power infrastructure – charging equipment – digital platform

Each Scharge station is designed in three independent but closely linked layers: the power infrastructure layer ensures supply and safety, the equipment layer converts and delivers energy to the vehicle, and the digital platform layer runs charging sessions, payment and remote operation.

Layer 3Digital platform
Scharge appEV users
Scharge platformcharging sessions · tariffs · payment · monitoring · alerts · OTA
Admin web portalinvestors, station owners · SPT operations center · SST
Layer 2Charging equipment
AC charger · 7 – 14 kW1-phase 220 V · Type 2
DC charger · 40 – 400 kW200 – 1 000 V DC · CCS2
Electric vehicleBEV · PHEV · 5 m cable
Layer 1Power infrastructure
Gridmedium voltage / low voltage
Transformer substationsized to installed capacity
Main distribution boardsmart meter · SPD Type 1 + 2 · CB + Type B RCD per charger feeder
energy flowdata flow
View the Scharge digital platform

13 · Deployment

Deployment through a single point of contact

Six steps from survey to operation, with an indicative timeline of about 6 – 7 weeks for stations not requiring a transformer substation upgrade.

  1. 1Site surveySite, power supply, charging demand
  2. 2Solution designCharger configuration, installed capacity, single-line diagram, quotation
  3. 3Contract and orderingContract signing, advance payment, order placed with the supplier
  4. 4Equipment supplyAbout 03 weeks from order
  5. 5Construction and installationPlinths, cables and electrical boards in parallel with supply; chargers installed on delivery
  6. 6Acceptance and activationTesting, test run, platform activation, training, handover
View the full deployment process

Scharge stations at CD Restop rest stops

Scharge charging zones are laid out according to the four rest stop tiers of the CD Restop design standard, from a small affiliate point to a Complex integrated hub.

Rendering of a Tier C affiliate point: a small building with CD Restop and GOMO signage, two Scharge chargers and a car charging in front.
Approach view of a Tier C affiliate point with the Scharge charging zone in front.
Rendering of a Tier A rest stop at dusk: illuminated service building, a row of Scharge chargers and vehicles charging.
Frontage of a Tier A rest stop at dusk with signage and an organized charging line.
Close-up rendering of a dual-connector Scharge charger between two cars charging, with the service building behind.
Standardized detail: one Scharge charger with two charging connectors and two vehicles.
View the four rest stop tiers
Scharge app

Charge with the Scharge app

Scharge app icon.
SchargeThe app is published by Saigon Postel Corporation, i.e. SPT Group (Saigon Postel), on Google Play and the App Store under the name Scharge – Trạm sạc xe điện.

Scharge is the app for EV drivers. Find a charger, start a charging session with a QR code and track your electricity cost while you charge.

View app features
User guide

Using the Scharge app in 10 steps

For EV drivers: from installing the app, topping up the wallet with VietQR, finding a station, starting and stopping a charge, to receipts and e-invoices. The full version with step-by-step screenshots is in the PDF.

  1. Install and open the app
  2. Sign up and sign in
  3. Forgot password
  4. Top up the wallet with VietQR
  5. Find a station on the map
  6. Start charging
  7. Monitor and stop
  8. Receipts, history and e-invoices
  9. Account: language, sign out, delete account
  10. If something goes wrong

Scharge alliance

The brand owner and the deployment partner, together with the partners who signed the first phase of strategic cooperation for the Scharge project.

On September 9, 2026 in Ho Chi Minh City, SPT Group, CD Restop, DTH Holdings and Coro Energy signed the first-phase strategic cooperation agreement for the Scharge project.

Watch the signing ceremony

Video: CD Restop investment cooperation signing ceremony, 9 September 2026 · LINHNAM Official channel
View partnership models

Bring a Scharge charging station to your site

Send us your requirements and CD Restop will survey the site and propose a suitable configuration.

Request a site survey0981 107 900